Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
07-09-2020, 02:34 PM | #1 |
Registered User
Join Date: Dec 2012
Location: Harrison, AR
Posts: 1,069
|
Cab floor replacement order
Hello, I am to the point where I will be replacing my cab floor over the next few weeks. I have the cab braced and have removed the outer rockers. Also, I have drilled all of the spot welds at the rear cab wall. I still need to remove the spot welds on the footwell flange. I am wondering for anybody who has done this before did you pull the floor and align the new floor to the old A and B pillars or did you replace the lower A and B pillar sections first and then install the new floor? Below are the pieces I am needing help with replacing before or after floor install. Thanks.
__________________
Keagan 68 SWB C-10 original 350 A/C 503 Mean Green |
Bookmarks |
|
|