View Single Post
Old 07-30-2020, 09:38 AM   #995
SCOTI
Registered User
 
SCOTI's Avatar
 
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 21,919
Re: Project: Recycle

When I opened up the upper bag mounting plate for C/O clearance, I only removed the bare minimum of material. My plan was to remove the minimum & creep-up on what was necessary so I didn't remove more than what is required leaving as much structure as possible.

With the quick install, I needed to start the trimming. I had previously marked out where I anticipated the end of the bracket would be. I took a grease pencil & sketched out the rough shape I had planned for the remaining edges of the bracket once trimmed. For this initial C/O install, I cut half-way to that anticipated point. This allowed the C/O to physically bolt-in to the mounts for alignment validations.
Attached Images
  
__________________
67SWB-B.B.RetroRod
64SWB-Recycle
89CCDually-Driver/Tow Truck
99CCSWB Driver
All Fleetsides
@rattlecankustoms in IG

Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive.
It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar.....

Cubic inches is like Indiana Jones with a cheap pistol.
SCOTI is offline   Reply With Quote