The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1969 - 1972 Blazers and Jimmys Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-14-2012, 09:50 PM   #11
hgs_notes
GEARHEAD
 
hgs_notes's Avatar
 
Join Date: Aug 2003
Location: MN
Posts: 6,121
Re: Blazer retractable convertible top

The water used can be mixed with glycol to lower the freeze point, but that is usually just used when the water is heating a slab outside the building, like to melt the snow off the driveway or sidewalk. Once the slab in the garage is warmed up it would take several days below freezing before it would freeze, and with the pex tubing incased in cement, it shouldn't ever expand enough to damage the tubing, which is also flexible. I've seen large old buildings go without heat for a few days with temps below 0 F and be comfortable.

I'm a boiler inspector by trade and see these systems all the time, but I have never seen one run with cooled water through it. Maybe I misunderstood what you are planning. A cold slab will end up absorbing a lot of moisture and seem damp all the time. Could end up with mold problems. Can't say I would recommend it.
hgs_notes is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 09:44 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com